Office building at night with illuminated floors and visible building systems

Actual demand

Occupancy · HVAC · Lighting

OFFICE PERFORMANCE

Hybrid working changed office occupancy.
Building operations did not adapt.

Match heating, cooling, ventilation and lighting to actual occupancy across floors, working days and seasons. Measure the impact on energy, comfort and operating cost.

THE OPERATING GAP

Office demand is no longer predictable.
Building schedules often are.

Occupancy changes by floor, working day and season. Yet many systems still operate as if every workspace were fully occupied.

Cross-section of an office building at night showing heating, cooling and ventilation systems

01

Conditioned without demand

Entire floors can be heated or cooled despite only partial occupancy.

02

Conflicting systems

Heating and cooling may operate simultaneously in the same building.

03

Hidden out-of-hours loads

Night and weekend consumption, and technical faults, can remain undetected.

The result

Energy use no longer reflects how the office is occupied.

VARIABLE DEMAND

Office use is dynamic.
Building operation should be too.

Occupancy varies by hour, weekday and season. Static schedules do not. The objective is to operate the building according to actual demand.

01 · Time of day

Respond to
occupied hours

Align operation with occupied hours.

02 · Day of week

Adapt operation
across the week

Reflect differences between higher- and lower-occupancy working days.

03 · Season

Respond to
seasonal demand

Heating and cooling demand changes throughout the year.

Line chart showing heating and cooling demand rising and falling across the year

Operating principle

Building operation follows actual demand.

ILLUSTRATIVE OFFICE BUSINESS CASE

One office.
Two sensitivity cases.

The same illustrative 30,000 m² office is tested at 15% and 20% operational reduction.

Common baseline

30,000 m²

net lettable area

5,400,000 kWh annual consumption

€563,054 annual energy cost

Case A

15% sensitivity

€84,458

operational saving per year

Energy saved

810,000 kWh

CO₂ avoided

159 t

Tenant share · 50%

€42,229

Landlord share · 50% gross

€42,229

Value sensitivity · 7.0% perpetuity

approx. €0.60m

Case B

20% sensitivity

€112,611

operational saving per year

Energy saved

1,080,000 kWh

CO₂ avoided

212 t

Tenant share · 50%

€56,305

Landlord share · 50% gross

€56,305

Value sensitivity · 7.0% perpetuity

approx. €0.80m

How to read the case

Illustrative sensitivity inputs, not expected results, not measured workcloud24 performance and not additive.

Landlord shares are gross before platform, integration and measurement-and-verification costs. The value lines are sensitivities, not valuations.

WORKPLACE PERFORMANCE

Tenants do not occupy energy certificates.
They occupy a workplace.

For the occupier, building performance becomes meaningful through cost, comfort, reliability, sustainability and data.

Open-plan office lounge with colleagues meeting around a table

01

Cost

Energy use, service charges and occupancy cost.

02

Comfort

Temperature stability and fewer comfort complaints.

03

Reliability

Technical performance and response times.

04

Sustainability

Energy, carbon and building-performance information.

05

Data

Evidence for ESG and workplace decisions.

Measurable indicators

Tenant NPS · comfort complaints · tenant satisfaction · response times · technical reliability · occupancy cost per m² · ESG-data availability

Each measure can support a business outcome. None follows automatically.

MARKET EVIDENCE

Sustainability influences
rent, take-up and renewal.

Independent research shows how certified and higher-performing offices differ in the market.

CBRE

+4.9%

Rental premium

Certified office buildings compared with non-certified stock.

CBRE

26% / 50%

Stock / take-up

Certified offices represent 26% of stock and 50% of take-up.

CBRE

60%

Renewal decisions

Occupiers citing sustainability as a factor in renewal decisions.

Knight Frank

8.93 yrs

Average lease length

EPC A London offices, compared with 6.21 to 6.69 years for EPC C to E.

How to read the evidence

Observed market differentials, not effects attributable to workcloud24 and not guaranteed outcomes.

CBRE: 23,750 European office leases and European Office Occupier Survey 2025. Knight Frank: London office lease-length research.

THE WORKCLOUD24 SOLUTION

From building data to office performance and business value.

Building meters, controls and documents connected by data lines to a central platform

01 · Connect

Bring building data together

BMS, meters, IoT, sensors, energy, occupancy and weather data are read in parallel.

02 · Understand & optimise

Turn information into action

AI optimisation, anomaly detection, forecasting, benchmarking and fault detection identify priorities.

03 · Verify & translate

Connect performance to decisions

Measure energy, CO₂, comfort, reliability and cost, then relate the evidence to tenants, income and value.

Each level can support the next. None of them follows automatically.

VALUE FOR THE OFFICE

Shared evidence. Different decisions.

For occupiers

A better workplace experience

01

Clearer occupancy costs

02

Measurable comfort and satisfaction

03

Visible operational reliability

04

Accessible sustainability data

For owners

A clearer asset perspective

01

Monitored operating performance

02

Evidence for tenant dialogue

03

Operational savings linked to NOI

04

Evidence for asset management

PROJECT APPROACH

Start with the building you already have.

Measurement comes first. The implementation decision follows the evidence.

01

Assess

Read the existing building

Bills, meters, BMS, schedules, occupancy and technical systems.

02

Report

Establish the baseline

Identify base loads, HVAC conflicts and optimisation potential.

03

Agree

Agree the model

Owner and tenant agree how verified value will be shared.

04

Optimise

Implement and verify

Improve operation, measure results and track agreed business KPIs.

Assessment before commitment

Make the existing building work better before deciding where major CapEx is needed.

Cover of the workcloud24 Office white paper, Sustainable office operations

OFFICE WHITE PAPER

From office operations
to asset performance.

Explore the assumptions and evidence behind operational optimisation in office buildings.

Operational savings

Tenant performance

Asset value

PDF

Offices · Sustainable operations

Office building at night with illuminated floors

A PRACTICAL FIRST STEP

Start with one office building. See what the data already shows.

Begin with the bills, meter data and systems you already have. We will show where operation and occupancy drift apart, what can be verified and which next step makes sense.

No upfront fee · No obligation

Prefer to explore first?

FREQUENTLY ASKED QUESTIONS

The essentials, before we talk.

Three practical questions about starting with an existing office building.

Can workcloud24 use the systems already installed?

What does the initial assessment include?

How are verified savings shared between owner and tenant?